// Construction / Building work

Building work and new construction

Building work.
Spaces to live in.

Building work and renovation in Piedmont, Liguria and Lombardy for flats, houses, commercial premises and industrial properties. Athene coordinates the skills needed for individual works or a turnkey project.

Let’s discuss your project

From Costigliole d’Asti, serving Piedmont, Liguria and Lombardy.

Building work on a wall — Illustration of ATHENE services
ATHENE · ALL THE SERVICES. ONE HOME.

// Activities

Building work.
What we can
coordinate.

We agree the work and supplies for your property.

01

Renovations

Work on residential and industrial properties defined by site conditions and the design.

02

Building work and new construction

Coordination of planned building activities, from demolition to construction.

03

Interior reconfiguration

Changing layouts and integrating masonry with systems and new uses.

04

Finishes and work checks

Coordination of final tasks, checking completed work and handing over relevant documentation.

// One point of contact

How we coordinate
the work.

The site visit establishes needs; design and procedures prepare the work; Athene coordinates tradespeople and suppliers on site. Checks continue through to handover. Activities, timescales and conditions are defined for each project.

Explore our approach

// Piedmont · Liguria · Lombardy

Building work,
within a coordinated project.

Masonry work may involve systems, layouts and finishes. In Piedmont, Liguria and Lombardy we define activities from site conditions and the design, coordinating technical professionals, tradespeople and supplies.

When the work is part of a larger project, choose our turnkey renovation service: from the first site visit to final checks, with agreed activities and responsibilities.

The choices that matter

Building work starts with understanding the existing structure. Openings, demolition and altered layouts cannot be assessed from a floor plan alone: structural elements and concealed installations must be identified. New construction also requires a design coordinated with the ground and the relevant approvals. Early investigation helps distinguish design preferences from constraints that cannot be ignored.

Organising this work

The sequence of work affects the final finishes. Service routes, levels and provisions need coordination before walls are closed. Protection and access must allow each trade to work as planned. In an occupied property, disruption to daily life and areas that may become unusable need their own assessment, rather than being treated as incidental details.

What to check at handover

Handover includes checking the agreed work and collecting relevant documentation. Defects to address, outstanding tasks and changes from the design should be identified clearly. Legal protection depends on the nature of the work: the workmanship protection page explains article 1669 without promising a blanket warranty for every type of intervention.

We agree activities and responsibilities through one point of contact.
The ATHENE approach explains the process from the first discussion to handover. Explore our approach

Available in Piedmont, Liguria and Lombardy.

Questions about this service

Can every internal wall be moved?

No. Partitions and structural elements must be distinguished, installations checked and necessary procedures assessed before work. The desired layout needs to be compatible with the real building and the technical design, rather than just an attractive floor plan.

Can I live in the house during construction?

It depends on scope, safety and disruption. Occupation cannot be assumed. Access, usable facilities and separation of work areas must be assessed before organising the construction sequence and deciding whether continued occupation is practical.

Do you coordinate installations and finishes too?

Yes. Building work can form part of a coordinated renovation. The appointment distinguishes included work and supplies so that walls, provisions, installations and finishes follow a shared programme with clear responsibilities.

How are unexpected conditions found during demolition handled?

Concealed conditions may need further investigation. The appropriate professionals assess the solution and discuss it with the client, including effects on other work, the programme and financial arrangements, before proceeding with the affected activities.

See how we coordinate your project ↗

// The next step

Let’s discuss building work.
Let’s start with your property.

Tell us what you have in mind and where the property is.
We’ll work out where to start together.